Trussed roof section sitting on floor slab with scaffolding erected.
First lorry arriving with wall panels.
Lowering first floor cassette into position.
Continuing laying first floor.
Final first floor cassette being lowered into position.
One of the first roof cassettes being craned into position.
Ground and first floor stud partitions in position around stair well.
Roof cassette with roof lights being lowered into position over dining areas.
Roofing felt being applied to roof trusses and roof cassettes.
Mixer lorry arriving with floor screed.
Zinc gutter brackets fixed to fascia.
Floor screed being delivered to pump.
Completed floor screed in utility room.
Kitchen protected whilst walls are painted.
Roof tiles on, render finished and rainwater goods complete.
Electrical first fix proceeding.
Joe beginning to fit the staircase.
John and Joe fitting stringer to stair.
John and Joe checking level of flight.
Hardwood flooring being laid in study.