cardrona1

Trussed roof section sitting on floor slab with scaffolding erected.

cardrona2

First lorry arriving with wall panels.

cardrona4

Lowering first floor cassette into position.

cardrona5

Continuing laying first floor.

cardrona6

Final first floor cassette being lowered into position.

cardrona7

One of the first roof cassettes being craned into position.

cardrona8

Ground and first floor stud partitions in position around stair well.

cardrona10

Roof cassette with roof lights being lowered into position over dining areas.

cardrona11

Roofing felt being applied to roof trusses and roof cassettes.

cardona12

Mixer lorry arriving with floor screed.

cardrona13

Zinc gutter brackets fixed to fascia.

cardrona14

Floor screed being delivered to pump.

cardrona15

Completed floor screed in utility room.

cardrona16

Kitchen protected whilst walls are painted.

cardrona17

Roof tiles on, render finished and rainwater goods complete.

cardrona18

Electrical first fix proceeding.

cardrona20

Joe beginning to fit the staircase.

cardrona21

John and Joe fitting stringer to stair.

cardrona22

John and Joe checking level of flight.

cardrona23

Hardwood flooring being laid in study.

 
 